RenoPilot
Builder workspace
Checking your secure server session.
Builder workspace
Checking your secure server session.
Your projects at a glance.
The original live snapshot for the current job.
| Job | Type | Status | Revised price | Spent (trades) | Owed (client) | Progress |
|---|
Tap the contractors you want on this job. They will be ready in Team & contractors as soon as the job is created.
Keep messages, approvals, quotes, invoices, contracts and every uploaded job document together for the current job.
Live commercial and document information for the current job. Use the source pages only when you need to edit or issue a record.
Images are compressed for storage. Other files must be under 900 KB each.
RenoPilot saves immediately on this device. When RenoPilot Server is configured, the same data also syncs to your cPanel MySQL database. Keep a downloadable backup as an extra portable copy.
A backup includes every job, its costs, estimate, notes, tasks, photos, progress log and contract details, plus your saved business details. Total storage in use: — .
Choose the fastest path for this enquiry. Both methods create a working estimate that can become a quote when you are ready.
0 shown · 0 total
Every generated quote, across every client and job.
0 quotes
Every generated invoice, across every client and job.
0 invoices
0 payments
Contractor, supplier and other expenses for the selected job.
Choose the job this cost belongs to, then record the supplier or contractor expense.
0 expenses
Create the client once. Their name, phone, email and address will be reused for jobs, quotes, invoices and correspondence.
Select a client and create their job.
| Name / business | Trade / category | Phone |
|---|
Slabs, footings, reinforcement, excavation, formwork and concrete placement.
| Material | Qty | Unit | Specification |
|---|
| Item | Trade | Qty | Unit | Rate | Cost |
|---|
Concrete, exposed aggregate, asphalt, paving, gravel, drainage and access.
| Material | Qty | Unit | Specification |
|---|
| Item | Trade | Qty | Unit | Rate | Cost |
|---|
True 3D design, posts, beams, rafters, roofing, gutters, footings and attached structures.
| Material | Qty | Unit | Specification |
|---|
| Item | Trade | Qty | Unit | Rate | Cost |
|---|
Demolition, waterproofing, tiling, plumbing, electrical, fixtures and finishes.
| Material | Qty | Unit | Specification |
|---|
| Item | Trade | Qty | Unit | Rate | Cost |
|---|
Roof areas, pitch, sheets or tiles, flashings, gutters, downpipes and safety.
| Material | Qty | Unit | Specification |
|---|
| Item | Trade | Qty | Unit | Rate | Cost |
|---|
Turf, gardens, soil, mulch, irrigation, edging, paths, steps and planting.
| Material | Qty | Unit | Specification |
|---|
| Item | Trade | Qty | Unit | Rate | Cost |
|---|
Pipe runs, pits, channels, trenches, bedding, falls and connections.
| Material | Qty | Unit | Specification |
|---|
| Item | Trade | Qty | Unit | Rate | Cost |
|---|
Slab, framing, cladding, roof, doors, insulation, lining and services.
| Material | Qty | Unit | Specification |
|---|
| Item | Trade | Qty | Unit | Rate | Cost |
|---|
Strip-out, structural removal, waste, plant, protection and hazardous-material allowances.
| Material | Qty | Unit | Specification |
|---|
| Item | Trade | Qty | Unit | Rate | Cost |
|---|
Plan wall runs, levels, drainage, excavation, reinforcement, materials, labour, pricing, drawings and a complete PDF pack.
| Material | Qty | Unit | Specification |
|---|
| Item | Qty | Unit | Rate | Cost |
|---|
Draw the fence shape, configure style and gates, inspect it in 3D, then generate materials, labour, pricing and the construction pack.
Pick a shape, choose the fence style, then drag the corner points or edit each section. Quantities and price update from the same design.
Plan set-out, elevation and footing detail update automatically.
| Material | Qty | Unit | Specification |
|---|
| Item | Qty | Unit | Your cost / unit | Your cost |
|---|
Start simple, then add access, barriers or a roof only when the job needs them. Every choice stays editable below.
| Calculation input | Market item | Rate used | Source |
|---|
Warnings update as you type. They are prompts to verify, not a compliance certificate.
Select a layer below, then click any member in the drawing for its full specification.
| Item/specification | Unit | Qty incl. waste | Unit rate | Cost |
|---|
| Activity | Hours | Rate/hr | Cost |
|---|
Track every enquiry, schedule the next follow-up, and convert accepted work into a live RenoPilot job without re-entering client details.
Only the essentials. You can update the lead as the conversation progresses.
Load PDF or image plans, scale every page accurately, measure the work, and keep each quantity linked to the estimate.
Measurements are checked automatically as you work.
Each item can contain measurements from several plan pages, including deductions.
See revenue, invoicing, cash collected, actual costs, committed orders and forecast-to-complete in one view. RenoPilot flags margin pressure before the job finishes.
Enter costs still expected after current supplier commitments.
Use this for purchase orders and subcontract agreements not yet fully received as costs.
Purchase orders and subcontract commitments that affect the forecast.
Capture everything on your first visit, room by room, so nothing gets missed when you quote. Saved automatically against estimate — .
Add one card per room or area. Tick the trades needed there — each area can push a starting line straight into the estimate, with area-based trades (flooring, painting) picking up the real m² automatically.
Send the walkthrough scope to the right trades, record their returned prices, compare responses and add the chosen price to the estimate.
Review scope, quantities, supplier pricing and sell price before converting this estimate to a quote.
This estimate can contain walkthrough scope, design-module take-offs, trade prices and manual lines. Estimate reference — .
Starter rates are indicative Australian residential trade-cost guides using a Melbourne/Victoria baseline (mid-2026 market data) — treat them as a first pass, not a quote. Update every line to your own suppliers' and subcontractors' current pricing before sending anything to a client. Overhead, margin and GST below are applied on top of these cost rates to reach the sell price.
Pick a trade and item — RenoPilot builds the line item for you, with sensible default rates you can override. Electrical and plumbing capture whether it's a new install or a replacement and how many; flooring and painting capture the room, area in m² and (for painting) the colour and finish.
For anything not covered by the quick-add trades above.
Create a printable estimate pack containing the current scope, line items and commercial summary.
See who was used, what was paid and what is still owing across the business or for one job.
Choose a job to view expenses
This job is completed. Its expense history remains available here.
Log invoices and payments as trades bill you, then compare actual spend against the estimate in real time. Saved automatically in this browser for job — .
| Date | Category | Payee / trade | Reference | Invoice total | Paid | Owing | Status | Paid by | Actions |
|---|
Settlement uses the job cash method: contract total less all job costs gives the profit / loss. Profit is split 50/50, then each owner is reimbursed for costs they personally paid. Record money already received / taken out below and RenoPilot calculates the final amount due to each owner.
| Date | Owner | Already received / taken out | Amount |
|---|
Estimate vs. actual invoiced, from the cost log.
| Category | Estimated | Invoiced | Paid | Outstanding | % of budget |
|---|
Every payee with invoices logged against this job.
| Payee / trade | Invoices | Total | Paid | Outstanding |
|---|
Unpaid invoices, oldest first. Anything over 30 days is flagged.
| Date | Payee / trade | Reference | Amount | Days outstanding |
|---|
Invoiced amounts grouped by month logged.
| Month | Invoices | Total |
|---|
Every cost entry logged against this job, most recent first.
| Date | Category | Payee / trade | Reference | Amount | Status | Paid by |
|---|
Assign every trade to this job, define their scope and work order, then track bills, payments, progress, timesheets, tasks and compliance in one place.
A running to-do list for job — .
Freeform notes, decisions and reminders for this job.
A visual record for job — — before/after shots, site conditions, selections, anything worth keeping on file.
Photos are compressed and stored in this browser, same as everything else — so they're private to this device and count toward the browser's storage limit. Usage: — .
Log where the job is up to. Saved per job, for job — .
Add site photos, certificates, PDFs or other progress evidence.
Enter your details once. RenoPilot reuses them across contracts, invoices, variations and printable reports.
These details appear on invoices.
Paste a no-code hosted payment link — a Stripe Payment Link, PayPal.me link or Square link. No API keys needed. It becomes a "Pay [balance] online" button on unpaid invoices and in reminder messages. Stripe Payment Links automatically get the invoice number attached so payments reconcile back to the right job.
Your saved company profile, logo, contact and banking details are used automatically on this contract and related documents.
For job — . Price and scope pull from the estimate — override if needed.
Estimated completion: —
Stages must add up to 100% of the contract price. The deposit stage is added automatically.
| Stage / milestone | Description | % | Amount |
|---|
Scope pulls automatically from your estimate line items. Add anything else here.
Anything specific to this job — access arrangements, working hours, site conditions, etc.
Set to 0 to omit a trade from the warranty table.
Capture both signatures on this device — hand it to the client to sign, or sign your own copy first. Signed contracts show the signature and signed date on the generated PDF instead of a blank line.
Create and manage client quotes without a job. A job is created only after the client accepts the quote and it is converted to an invoice.
Track the real cost of the job — materials, suppliers, trade contractors, subcontractors, hire, fees and other expenses.
Every supplier bill and job expense recorded against this job.
| Date | Type | Supplier / contractor | Description | Reference | Amount | Status |
|---|
Create a manual or walkthrough quote, save it as a draft or send it, then convert approved work into an invoice and job.
Set the deposit above, then add the progress stages and percentages the client will be invoiced at. If you use stages, the full schedule must total 100%.
Add each item you want the client to see. Enter the description, quantity, unit and rate, then tap Add line item .
When a quote is accepted, RenoPilot creates the linked master invoice and the job at the same time. Use a custom invoice only for work outside an accepted quote.
Linked invoices use the same reference as the quote (for example QTE-264 → INV-264). Later stage claims keep that reference and add -02, -03, and so on.
Build the invoice manually with as many items as needed. GST is calculated automatically.
Record deposits, part-payments, final payments or credits and issue a receipt immediately.
One source of truth for the accepted contract, approved variations, progress claims, payments, credits and remaining balance.
Save repeat billing templates, then generate anything due with one tap.
For job — . Record any change to the scope of works — the contract requires these to be agreed in writing before they proceed.
Cost impact can be negative for a credit or omission. This log is separate from your Estimate Builder scope — approved variations adjust the revised contract price shown below and used on invoices, but don't rewrite the original estimate.
| Ref | Description | Date | Amount + GST | Days | Status / payments |
|---|
For job — . Log defects found at the practical completion joint inspection, and track them through to rectification within the defects liability period.
Every export regenerates from the current design, so recalculate first if you've just changed a field.
Selections, suppliers, allowances, approvals and notes.
All uploaded plan pages with calibration details.
Measurement items, units, rates and calibration register.
Design materials, estimate materials and procurement.
Quote register, revisions, totals and acceptance evidence.
Claims, invoices, payments, credits and balances.
Variation scope, value, time impact and approvals.
Current building contract and payment schedule.
Programme, procurement, RFIs, inspections and handover.
Assignments, costs, progress, timesheets and compliance.
Printable site photo report with captions and dates.
Site notes, actions, owners, due dates and status.
Defects, locations, severity and rectification status.
Existing complete design, costing and drawing report.
R12-compatible DXF with joists, bearers, posts, footings, decking and barriers on separate layers for CAD.
Printable A4 set: framing, joists, bearers, footings, decking, barriers, stairs, roof and elevations.
Cover page, full drawing set, materials, cut list, labour, footings, commercial summary and job costs.
Full material schedule with quantities and costs, ready for a spreadsheet or supplier order.
Every member with mark, specification, length and quantity for cutting and stock ordering.
Full-size stringer marking-out template for risers and goings, ready to print at 1:1 scale.
Sent, part-paid and paid invoices in Xero's Sales Invoices bulk-import column format, ready to import.
One row per invoice with GST split out and balances — column-mappable in MYOB's import wizard or any bookkeeping tool.